For urgent orders, what is the shortest turnaround time you can offer in terms of production scheduling?

Leveraging our multiple high-speed production lines—operating continuously 24/7—we boast a daily production capacity exceeding 30 tons. For urgent "fast-track" orders, and depending on specific material specifications and current workshop workload, we can typically complete production within 3 to 7 days. If your project faces an impending deadline, please contact our sales team immediately to facilitate a real-time scheduling assessment.

How is the product packaging? Does it feature a protective outer film that is both sun-resistant and waterproof?

Protection during transit is our priority. Every roll is first wrapped in a heavy-duty UV-stabilized woven geotextile or black PE stretch film to prevent sun damage and moisture ingress.
Each roll is clearly labeled with product specifications, batch numbers, and dimensions. For easy unloading at the job site, we provide durable lifting belts (slings) attached to the rolls upon request, ensuring the material remains pristine from our factory to your project site.